America 250 · Our Semiquincentennial Projects →
Home Decks & Steps Outdoor Furniture Gallery About Contact
Outdoor · Florissant & St. Louis

Decks & Steps

New decks, rebuilds, and entry steps, built by hand from the posts up.

What We Build

Outdoor Carpentry, Done Right

Same hands, same standards as our furniture. Hand-picked lumber, careful joinery, and no shortcuts on the parts you can’t see.

No. 01

New Decks

Built to fit your yard and the way you use it, from the footings to the last rail cap.

Cedar · Custom Layout
No. 02

Rebuilds & Repairs

A tired deck torn down to what’s sound and rebuilt. We save good posts and framing wherever we can.

Tear-Out · Rebuild
No. 03

Entry Steps

Solid cedar steps for a back or side door, finished with a mitered picture-frame top.

Cedar · Picture-Frame Top
No. 04

Stairs & Railings

New staircases down to the yard and railings that are as solid as they look.

Stairs · Rails · Caps
No. 05

Staining & Sealing

A finish chosen to protect the wood and match the house, applied by hand.

Stain · Seal
No. 06

Outdoor Furniture

Finish the deck with Adirondack chairs built in the same shop.

See the Chairs →
Three-step cedar entry stairs at a back door
Project

Cedar Entry Steps

A boxed set of three cedar steps for a back door, with a mitered picture-frame border on the landing and every board cut to sit tight.

A small job, built with the same care as a full deck.

Cedar · Mitered Border
Featured Project

Backyard Deck Rebuild

The old deck had given out. We tore it down to the posts, kept what was still sound, and rebuilt it in cedar: new decking, new rails, new stairs, and a stain to protect it for years to come.

The old backyard deck, collapsed and pulled apart, before the rebuild
Step 01

What We Found

Years of Missouri weather had done their work. The decking was rotten and the frame was coming apart. It was past repair.

Milton Weis standing among the old deck posts after tear-out
Step 02

Down to the Posts

Everything came off by hand, down to the posts and footings, so we could see exactly what we were building on.

New cedar spliced onto an original deck post with a half-lap joint
Step 03

Save What’s Sound

The original posts were still solid at the base. Instead of ripping them out, we cut a lap joint and spliced fresh cedar onto each one.

It’s stronger, it’s less waste, and it keeps a piece of the old deck in the new one.

Half-Lap Splice · Cedar on Original Posts
Fresh cedar deck boards laid across the new frame
Step 04

New Cedar Decking

Every board was hand-picked, cut to fit, and fastened in a straight line from end to end.

Step 05

Rails & Stairs

Posts capped and rails run around the full deck, with a new staircase down to the yard.

Cedar railing going up around the new deck
New cedar staircase leading up to the deck
Finished cedar deck with full railing, before staining
The finished deck, stained a deep red, overlooking the backyard
Step 06

The Finish

A deep red stain to seal the cedar and match the house. The deck is ready for summers on the back porch.

Cedar · Solid Stain · Florissant, MO

Deck seen better days?

New builds, rebuilds, and entry steps. Tell us about your project.

Request a Quote